2005 Achievements :
From the
first moment of the new municipal board , we adopted transparency
and frankness with our people to keep them up with any developments,
since we believe this to be a must for any successful work.
The elected
Municipality is one year old now ,despite the many obstacles we
faced , the unusual hard conditions in Palestine ,in the absence of
law sovereignty and executive deterrent authority , and the lack of
resources , the Municipality did all efforts to implement its
elections agenda according to priorities , which took time to
identify the urgent and the important issues that should be done
first .
Here is a list of 2005 outcomes :
1- The community social center was open and ready for utilization.
It is (320 m2) . It consists of a meeting hall ,
activities hall. The total cost reached (83,000 $).
2-Selected backfill supplying to enlarge Mahat Street which became
(10m) wide , and to pave the( 7 m.) Gharbiyyeh street .The total
cost reached (32.500 NIS).
3- Constructing stairs for Mahat Str. And trash cans stands: this
project included to increase the street's retaining wall (1 m.) high
, and constructing two stairs to enable people to reach their lands
there. Trash cans bases were made available in different sites in
the town. The total budget was ( 29.700 NIS).
4-
Tana road
rehabilitation :
a- supplying
base course
b- storm
sewer system , (50cm) diameter reinforced concrete pipe culvert.
c- enlarging
unsafe parts of the road.
Total cost
was (19.000NIS).
5- Trash cans maintenance and delivery , solving garbage problem in
cooperation with the Palestinian Center for Democracy and conflict
Dissolve .The total cost was (59.000 NIS).
6- The Secondary Boys' School construction in cooperation with ANERA.
The project includes :
A-
a (2000m2) school building with (14) classrooms , labs ,
computer hall , a library , a head teacher room and a teachers'
room.
B-
playgrounds and walls.The total cost is (500,000$).
7- Land purchasing for new roads. The cost was (4350 JD).
8-
Launching , www.beitfoureek.com , web site concerned with
all issues related to the town and municipality .Our email is :
info@beitfoureek.com
This cost (702$).
9- Establishing a children park , where kids can spend leisure time
and enhance their talents , in cooperation with UNECEF , it includes
:
a- providing
toys and kids playing stuff.
b-
Surrounding the park with walls .
It cost
(35.800 $) , in addition to the land provided by the Municipality.
10- Constructing walls and fences to expand a set of internal roads
( work for food program) . It included :
a- making
fences along the main street in order to become (16 m) wide.
b- A
retaining wall was made for Dreijat Area and Qunaytra .
the total
cost was (9000$).
11- Internal roads construction and rehabilitation :
a- roads were opened in Ein Mount , Dreijat, sheikh Muhammed , Karm
Al Hayek , Al Gharbiyyeh.
b- Supplying
selected backfill for the mentioned areas .
c-
Constructing concrete pipe culvert for storm sewage .
The total
cost was (60000 NIS).
12-Internal electricity network expansion : providing posts , cables
..etc
The total
cost was (150000NIS).
13- Working jobless project : in association with Labor Office , the
Municipality was able to provide job opportunities for hundreds of
workers during last year .This scheme provided about (800000NIS) .
14- Supplying electricity equipment with ( 158284 NIS) cost .
15- The Municipality grant (26500$)from the Municipalities
Rehabilitation urgent project .The sum was spent as follows :
a- purchasing
electric supplies.
b- supplying
computers and printers.
c- furnishing
the Beit Foureek Social Center.
16- Paying for the high-low pressure project bid for the east areas
which cost (117137 NIS).
17- Beit Foureek Medical Clinic was opened .The Municipality signed
a working agreement with the Medical Scientific Society .The Society
runs part of the clinic ( general medication , pharmacy , nursing ).
A number of physicians pay routine visits to the clinic .More
sections ( x-ray, laboratory , dental , hearse ) will be ready to
serve clients in a short time.
18- A discount for electric and water applications was made to
enhance people to get private lines .
19- An increase in building license applications , (152) were
approved during 2005.
Projects to be implemented in 2006:
We have
prepared a number of schemes during last year ,and we hope to
fulfill all of them and even more in the ongoing year .Here are some
of them :
1- Storm sewer system for the main street.
2- Paving the main street , constructing pavements along it.
3- Water network project which includes:
a- constructing ( 100m3)water storage tank .
b- main line (6 inch diameter).
c- pump
d- internal network and supplies.
4- Constructing a public park. |